BMRCL

BMRCL recruitment for Executive Engineer/ Assistant Engineer/ Section Engineer in Bangalore.

Bangalore
Diploma,BE/B.Tech
Last Date to Apply: 08-04-2019
Executive Engineer/ Assistant Engineer/ Section Engineer - Job Details Date of Posting: 07-03-2019

Executive Engineer/ Assistant Engineer/ Section Engineer  job opportunities in Bangalore Metro Rail Corporation Limited (BMRCL)

Executive Engineer

Qualification :  BE / B.Tech in Civil Engineering

Experience :  Minimum 12 years in large infrastructure project execution. Candidates with experience in Metro construction for Viaduct / Stations / Underground station / Tunneling with TBMs will be preferred.

Remuneration :  Rs. 80,000/-

Age Limit :  50 Years

No. of Posts : 100

Asst. Executive Engineer

Qualification :  BE / B.Tech in Civil Engineering

Experience :  Minimum 8 years in large infrastructure project execution. Candidates with experience in Metro construction for Viaduct / Stations / Underground station / Tunneling with TBMs will be preferred

Remuneration :  Rs. 65,000/-

Age Limit :  45 Years

Assistant Engineer

Qualification :   BE / B.Tech in Civil Engineering OR Diploma in Civil Engineering

Experience : 

BE/B.Tech holders: Minimum 5 years in large infrastructure project execution. Candidates with experience in Metro construction for Viaduct / Stations / Underground station / Tunneling with TBMs will be preferred.

Diploma holders: Minimum 8 years in large infrastructure project execution. Candidates with experience in Metro construction for Viaduct / Stations / Underground station / Tunneling with TBMs will be preferred.

Remuneration :  Rs. 50,000/-

Age Limit :  40 Years

Section Engineer

Qualification :   BE / B.Tech in Civil Engineering OR Diploma in Civil Engineering

Experience : 

BE/B.Tech holders: Minimum 3 years in large infrastructure project execution. Candidates with experience in Metro construction for Viaduct / Stations / Underground station / Tunneling with TBMs will be preferred.

Diploma holders: Minimum 6 years in large infrastructure project execution. Candidates with experience in Metro construction for Viaduct / Stations / Underground station / Tunneling with TBMs will be preferred.

Remuneration :  Rs. 36,000/-

Age Limit :  35  Years


No. of Posts :  50

Deputy Chief Engineer

Experience :  Should have retired as Deputy Chief Engineer or Equivalent from Central Govt/PSUs service having experience in major infrastructure projects and experience in underground works is preferable.

Remuneration : Rs. 110000/-

Executive Engineer

Experience :  Should have retired as Executive Engineer or Equivalent from Central Govt/PSUs service having experience in major infrastructure projects and experience in underground works is preferable.

Remuneration : Rs. 60000/-

Asst. Executive Engineer

Experience :  Should have retired as Asst. Executive Engineer or Equivalent from Central Govt/PSUs service having experience in major infrastructure projects and experience in underground works is preferable.

Remuneration : Rs. 50000/-

Assistant Engineer

Experience :  Should have retired as Assistant Engineer or Equivalent from Central Govt/PSUs service having experience in major infrastructure projects and experience in underground works is preferable.

Remuneration : Rs. 40000/

Age Limit :  The maximum age limit for all the posts is 60 years.

No. of Posts : 37 

Selection Process : Selection will be through interview by a Committee constituted by the Competent Authority. 


How To Apply For Executive Engineer/ Assistant Engineer/ Section Engineer  job opportunities in Bangalore Metro Rail Corporation Limited (BMRCL)

Eligible candidates may fill in the application on-line, take a print out of the same and forward along with relevant documents in support of qualification and experience. Such applications may be addressed to the General Manager(HR),Bangalore Metro Rail Corporation Limited, III Floor, BMTC Complex, K.H.Road, Shanthinagar, Bengaluru 560027 superscribing the envelope as “APPLICATION FOR THE POSTOF……………………………………” Last date for receipt of hard copy of the application is 4.00 PM of 08.04.2019



Click Here For Details About BMRCL jobs for Executive Engineer/ Assistant Engineer/ Section Engineer in Bangalore

About BMRCL

Several MRTS proposals for Bangalore have been in the pipeline for nearly 24 years. In 1982, a study suggested that the MRTS should have a route length of 12.20 km. and pegged the cost at Rs. 239.15 crores. In 1983, the Metropolitan Transit Project, an organization of Indian Railways, prepared a feasibility report for provision of suburban rail services on existing lines, a circular railway of 57.9 km. metro system on two corridors, in Phase-I 12.9 km. from Rajajinagar to Jayanagar and in Phase - II 11.2 km. from Hudson Circle to Krishnarajapuram. In 1988, a World Bank aided study was carried out by RITES and the study recommended a Commuter Rail System along with improvement of road transport system.